Claes de Vrieselaan, Rotterdam

On behalf of Stedin and Evides, we are working on the renewal of the underground infrastructure along the entire length of Claes de Vrieselaan. We are carrying out this work in close collaboration with the City of Rotterdam.

In anticipation of the street’s redevelopment, we are replacing and upgrading:

  • The medium-voltage and low-voltage networks
  • The gas network (high-pressure and low-pressure)
  • The drinking water network

Work began in March 2026 and is expected to continue until mid-2028.