Antwerpsestraatweg, Hoogerheide, phases 1 & 2

On behalf of Evides, we are carrying out phases 1 and 2 of this project. Phase 1 began in October 2025 and was successfully completed in February 2026, during which approximately 1,200 metres of water mains were replaced. Phase 2 is now also underway.

Within this project, we are responsible for the entire process: from engineering through to construction and handover. A total of 4.2 kilometres of water mains will be replaced. The complexity of the project lies, amongst other things, in the multiple crossings with the A4 motorway, which will be carried out using directional drilling.

Furthermore, as the works are taking place within a Natura 2000 area, the project is being carried out entirely emission-free and using electric power.